Thursday, January 24, 2013

January 24th, Session 1

The first half of our all day meeting is done. We decided that we needed to make a to-do list to double check that everything is ready for competition. We received out team shirts today and began to distribute them to those that bought one. The box for the robot and notebook is almost finish. The glue for the bottom shelf is drying and will probably be finish during the second session. We are testing the program to make sure that our autonomous does what we want it to and that the manual works the way we want. Double checking the pieces of the robot to limit potential problems at competition will be done after the break. This includes the rod feed through the bracket points as well as the rods, the bracket "elbows" that supports the lifter, and the lift stabilizer. Since we are powered by a battery, we thought that making a charging station will be useful. Posting again will be attempted at the end of the second session, that is if i am not working on something that will be very useful (such as the robot).

No comments:

Post a Comment